Scheduled Bid Openings
Design-Bid-Build Construction Project Advertisements
*Five new projects advertised on September 21, 2023
CDOT posts new advertisements on a bi-weekly schedule. Our next advertisement date is October 5, 2023. A schedule of future planned advertisement dates is available through this web link to the Bid Advertisement Calendar.
All projects currently advertised for bidding are listed in the table below. Projects Anticipated to be advertised for bid over next 180 days are available through this web link GoSheet Anticipated Project Report.
Note: Advertised project bid solicitation documents can be accessed through the CDOT Business Management System (B2G) from this web link B2G. This includes Plans, Specifications, Bid Proposal Files, Revisions, Questions and Answers, Plan Holder Lists, and other related documents. After logging into B2G, project bid details are found under the home screen "View" tab, then click on "My Bid Solicitations" in the dropdown list.
Notice to all contractors bidding CDOT projects: The Colorado Department of Transportation, in accordance with the Provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
Thank you for your interest in our construction projects. We look forward to working with you.
Projects Scheduled for Bid Letting on October 5, 2023
Project Number | Project Description | Bid Solicitation Documents |
---|---|---|
*MTCE 1191-042 (26050) |
This project is located in Region 4 in Boulder County. Project work consists of installation of shoulder rumble strips and permanent signing on SH119 from Boulder to Longmont. Please contact Daniel Marcucci at 303-921-3091 for project related questions. |
All bid solicitation documents are provided through the CDOT B2G system B2G. |
Projects Scheduled for Bid Letting on October 12, 2023
Project Number | Project Description | Bid Solicitation Documents |
---|---|---|
*NHPP 0405-041 (24416) |
This project is located in Region 4 in Lincoln County. Project work consists of intersection improvements on US 40 from MP399.05 to MP 399.15. Work will include widening the south side of the intersection with concrete pavement with inlet, sidewalk, curb and gutter, and curb ramp improvements. Please contact Rhianna Poss at 719-775-8003 for all project related questions. |
All bid solicitation documents are provided through the CDOT B2G system B2G. |
*NHPP 1211-101 (24622) |
This project is located in Region 1 in Jefferson County. Project work consists of ramp and frontage road improvements on US6 and Wadsworth Blvd. Work will include construction of an auxiliary lane and sound wall, as well as drainage improvements. Please contact Ben Davis at 720-497-6928 for all project related questions. |
All bid solicitation documents are provided through the CDOT B2G system B2G. |
Projects Scheduled for Bid Letting on October 19, 2023
Project Number | Project Description | Bid Solicitation Documents |
---|---|---|
*NHPP 0402-105 (24680) |
This project is located in Region 3 in Routt County. Project work consists of PCCP Rehab along US 40 between MP 130.5 and MP 133.5. Work includes slab repairs, routing and sealing, traffic control, ADA curb ramp repairs, pavement marking, and replacement of damaged curbs and gutters. Please contact Crissi Walters at 970-384-3331 for all project questions. Note: This project has a mandatory pre-bid meeting on Wednesday, October 04, 2023 beginning at 1:00pm being held virtually with how to attend below: Google Meet joining info: Video call link: https://meet.google.com/kfj-nxid-ker Or dial: +1 612-361-0317 (PIN: 680 353 298#) |
All bid solicitation documents are provided through the CDOT B2G system B2G. |
*FSA 050A-032 (21630) |
This project is located in Region 2 in Fremont County. Project work consists of building a roundabout at the intersection of the US50 offramp and SH115. Work will also include lighting, HMA, earthwork, concrete island and truck apron, and curb and gutter for roundabout. Please contact Scott Schnake at 719-527-5807 for all project related questions. |
All bid solicitation documents are provided through the CDOT B2G system B2G. |
*STM M240-178 (23115R) |
This project is located in Region 2 in El Paso County. Project work consists of replacement of curb ramps and pedestrian push buttons at various locations to bring ramps into ADA compliance. Please contact Scott Schnake at 719-527-5807 for all project related questions. |
All bid solicitation documents are provided through the CDOT B2G system B2G. |